During the bridge opening at the Simpson Bay Lagoon for incoming maritime traffic on January 8 at 5 p.m., M/Y Baca struck the Simpson Bay Lagoon Authority (SLAC) operations booth and caused severe structural damage, according to the Port St. Maarten Group (PSG). Wires leading to operations consoles were also damaged.
There were no injuries to the bridge operator. PSG personnel conducted a preliminary assessment, and the bridge remained in operation for maritime traffic and continued as normal for the remainder of the day.